Stage 03 · How we work

Build the access before the repair starts

The access system is the first thing built on a facade job and the last thing removed. It decides how the work runs and how the street underneath it lives.

Access is the first thing built and the last thing removed, and it decides how everything between those two points runs. On an occupied building it is also the part the neighbours experience.

The access system

Scaffold

Supported and suspended access to the elevation, planned around where the work actually is.

Sidewalk bridging

Overhead protection so the pavement below the work stays open and usable.

Netting and protection

Debris containment on the elevation, and protection of the entrances, windows and setbacks that stay in service.

Hoisting

Getting material up and spoil down without the building's own entrances becoming the route.

Working over an occupied building

Almost every building we work on stays occupied. People go in and out of the entrance under the shed, deliveries still arrive, and the retail at grade still opens. The access system is designed around that, and it is why protection goes up before the repair rather than alongside it.

Where the rules bite

Shed and scaffold permits

A permit is required before a sidewalk shed is erected, and before a supported scaffold over 40 feet. Initial sidewalk shed permits generally run a year, or until the contractor's insurance expires.

Site safety plans

Required for major buildings under the Building Code, including facade work on buildings 15 stories or greater.

Unsafe conditions

Where a facade report records an unsafe condition, protection goes up immediately and the repair follows on a deadline.

Coming down

A shed that stays up after the work is finished is its own problem for the building. Because the access and the repair are the same crews, the scaffold goes up when the work is ready and comes down when the condition is corrected.

Questions

Frequently asked

No. The scaffold, bridging, netting and protection are ours, which is why the access can be sequenced against the repair rather than against another company's schedule.

For major buildings under the Building Code. For facade work that threshold is buildings 15 stories or greater.

That is the normal case. The protection is designed so entrances, retail and the sidewalk stay in use while the elevation is worked on.

Access

Ask how the access would work on your building

Tell us the elevation, the height and what stays open at street level, and we will tell you what the protection would have to be.

Request a bid

Tell us about the project

Fields marked with an asterisk are required.

Project information
Service Contact information
Additional information

24/7